Case Study
Hawthorne Area Water Authority
Water Systems Improvement Project
Hawthorne Borough, Armstrong County, Pennsylvania
The worksite is located in ArmstrongCounty across Redbank Creek from the Borough of Hawthorn (which is located in ClarionCounty).
The project consists of three main components and they are as follows:
- Construction of a 200,000 gallon water storage tank and 8” force main.
- Construction of an interconnect with Redbank Valley Municipal Authority (RVMA) and HAWA.
- Extension of Waterline into the Village of Oakridge, Redbank Township, Armstrong County.
INTERCONNECT 5,000FT 6FT Wide
PUMPING MAIN 1,500FT 6FT Wide
WATER TANK 60FT 60FT Wide
DISTRIBUTION SYSTEM 1,800FT 6FT Wide
TOTAL AREA 3 Acres (150,600 SQ FT)
The total project cost for all three components is estimated at $2,520,000.00 |